HI all --
I am singlehandedly building my first full-blown drupal site (using 7),
rolling it out (for an art project that's already live), and testing
additional modules and blocks etc.
On the web server I have created a protected "sandbox" subdomain as my
"test server". I am trying to find the easiest way to move the test
files to the "production server" (i.e., out of the subdomain and into
the TLD), and to move files back when I want to do more testing &
development but using all the latest settings etc from the live site as
my starting point.
I have tried simple download/upload via ftp -- permissions all get
screwed on the sites/defaults/files/xxx path
I have tried gzip, download, upload tar -- the "sites" directory ends up
empty
it's a major drag to have to go into an ssh session to do chowns &
chmods every time i move stuff back and forth.
There must be an easier way.
If the easier way involves straight CLI please be gentle, CLI still
freaks me out
thanks!
kazar